ITEM RATE BUILD UP Play Video

Standard Items (as opposed to Composite Items) may be compiled from one or more resources selected from your Resource Library

Key Features

  • Select all the resources you need by ticking the selection box
  • Drill down to original resource record
  • Output option for labour/plant resources
  • Auto calc. rate totals after all changes
  • FastFind - Enter a key word(s) or part of a word in the last row to search for the resource you want
  • The Rate Buildup window may be kept open in some situations allowing you to view / edit the buildup of any highlighted rate without requiring drill down (although this is still possible)

To Build a Rate:

  1. Use the Select Resources button (or right click menu) to load the Select Resources form.
  2. Load the page where your resources are held (or use Search)
  3. Tag the resources you want to use in your rate and Save & Close when complete
  4. Quantify each resource for this rate. Note that for bill items, the Extended Data values are also calculated (you may have to scroll right to view these columns)

Output - Use this field to enter values normally associated with labour or plant. For example if you know that a bricklayer can lay 0.5m2 of single brick per hour then enter this value in the Output column. For a value entered as an Output, Fast Estimate calculates the Required Qty value using the formula: 1/Output. Another example could be an excavator that can excavate 2.5 m3 per hour with a given bucket size. Entering 2.5 into the Output column will calculate the correct number of hours required to complete a unit of the task being measured.

Bill Item Rate - Extended Values

Extended Qty - This is the Required Qty multiplied by the bill item Qty to give the total quantity required for this bill item
Extended Net Amount - The total net item value for this resource

Notes

  1. The Item Buildup can be displayed either be in overlay form (all other windows are frozen during editing) or can be an already open 'live' window where you can view/edit the build up directly (See Active Tools)
  2. After adding a quantity value for each resource a total for the rate (with breakdown) is calculated after applying any waste
  3. You may have to scroll right to view Extended Values, displayed with a blue background

Tips

  • A FastFind function has been included to further speed resource selection. If you know the resource name (or any part of it), enter it into the highlighted Description box and press Enter to list all resources that include your search word or phrase.